2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale
    2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale
    2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale
    2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale2025 THOR TRAILER THR-3-LPG-60-ST New Gas Tanker Trailers for sale
    Photos(4)

    2025 THOR TRAILER THR-3-LPG-60-ST

    Gas Tanker Trailers
    Call for price 

    Seller Information

    View Seller Information

    AGATHOR OTOMOTIV MADENCILIK DIS TICARET LIMITED SIRKETI

    Contact:Hakan Genis

    Ankara, Turkey 06800

    General

    Year
    2025
    Manufacturer
    THOR TRAILER
    Condition
    New
    Description
    60 m3 LPG TANK SEMITRAILER Chassis : Half chassis made of 6252 Steel quality . Strong and Heavy Duty type. Axles : 3 x Turkish Axles , German Tüv Approved with 14 tons capacity each. Brakes : Drum Brakes Suspension : Steel Suspension Brake System : Two line brake system with WABCO ABS according to European Norms, Automatic Slack Adjusters Landing Legs : 24 tons each according to the European Norms Kingpin : 2 ‘’ changeable to 3,5 ‘’ according European Standards. King Pin Plate thickness 12 mm Tyres : 12 + 1 385/R22.5 Bridgestone with Steel Rims Electrical System : 24 V according to European Norms. ( ADR stop lights, 5 Lights on each side ) Complete Reflectors and Signs 3M Brand , Wheel chocks, 2 x Fire Extuinguisher ADR , 2 Units Food Box, Sunshade on the Tank Accessoires : Water Tank , Spare wheel carrier Project Code : AD2000 Code-PED97/23/EC Design Temperature : Min -20 C / max. +50 C Design Pressure : 17,16 bar Test Pressure : 26,50 bar Tank Material : P355 GH Head Type : Elipsoidal External Tank Diameter : 2.400 mm Wall Thickness : 10 mm Equipments on Tank : -2 inch Safety Relief Valve : REGO 7534G ( 2 Units ) -Rotogauge – Rotary Level Indicator ) : REGO ( 1 Unit ) -¾ inch excess Flow Valve for Manometer ( 1 Unit ) -Thermometer (-30/60 C ) : Pakkens ( 1 Unit) -Manometer ( 0-25 bar ) : Pakkens ( 1 Unit ) -Hydraulic Operator ( 1 Unit ) -2 inch Hydraulic Valve ( 2 Units ) -3 inch Hydraulic Valve ( 1 Unit ) -2 inch Ball Valves : Batu ( 3 Units ) -2 inch Filler Flanges : M60x4 ( 3 Units ) -ACME Filler Cap : ( 3 Units ) -Filter : Batu ( 1 Unit ) -16 inch Manhole ( 1 Set ) -Earthing Bar : ( 1 Set ) Paintwork and Sandblasting : -During painting works of the external tank surface , it will be cleaned properly from any burr, hollow ,oil and dirt. -Following the cleaning works, sanding will be applied to obtain surface appearance of SA 2 ½ quality. -Roughness Value of the Surface will be 50 – 70 Rz -As First coat will be applied epoxy paint base with surface tolerance and dry film thickness of 180 micron -As the second coat , arcylic polyurethane top layer with high resistance with a dry film thickness of 70 micron -Final Coat color of the Tank will be white ( RAL 9010 ) -Total Paint Thickness will be 250 microns Radiographic Tests : -Welding Seams of the tank will be subject to radiographic control by 100 % longtidunal values . -Radiographic images will comply with the EN 1435 standard. -The Relevant staff will be certified according to EN473. -Radiographic examinations will be made through high-sensitive , panoramic and linear X-Ray devices. -These controls will be executed by certified staff Penetration Test or Magnetic Particle Test : -Nozzle _Body and Manhole – Body Welds will be controlled through penetration or magnetic particle test method by 100% Hydro static Test : -Following the construction , the tanks will be subject to hydro static test as per the design rules and standards. -During hydrostatic Test , clean and fresh water will be Liquid which may react to the tank materials will be used for hydro static test. -In case the water and ambient temperature is below 15 C, the hydrostatic test will be not performed -The Hydro static test will be accompanied by the independent certification body TURK LYOD . -Following the hydro static test, inside and all internal Pipes of the Tank will be dehydrated. -Inside of the Gas will be purged with gaseous nitrogen. Certification : -The tank will hold a branding / ‘’ Inspection Report and Certificate’’ issued by an international independent auditcompany ( Turk Lyod ) according to the European directive. -Quality Plan and F Module Certificate -Inspection Report and Certificate -Quality Plan -Sheet Orientation , Material List, Material Certificates -Material Orientation Plan -Material List -Sheet , pipe and flange certificates -Certificates of the welding materials -Welding Method Instructions ( WPS ) -Welding Method Tests ( PQR ) -Welder Certificates and Welding Plan -Plain seaming of the Body Sheet ( WPS ) -Circumferential welds of the Body ( WPS ) -Nozzle – Body – Manhole Weldings ( WPS) -Pipe – Pipe,Pipe-Flange Weldings ( WPS ) -PQR -Welder certificates -Welding plan -Dished Heads Reports, Head Treatment Graph and Report -Dished Heads control report -Dished Heads magnetic test report -Heat treatment graph and report -Welding Test reports of the Construction -Longitudinal welding seams -Circumferential welding seams -Non-destructive test reports -Eye and measure control report -Dye penetrate test reports -Radiography reports -Hydrostatic Test Report -Name Plate , Fixture Certificates -Carbon copy of name plate -Carbon Copy of the 3 rd party embossed stamp Baffles : -Tank will have three Units of Anti-Slosh baffles

    Attachments

    Compartments
    1

    Capacities

    Capacity
    32,000 L